PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Metal Furring at the 2nd floor Shear wall Elev. 1,2,3 Facing East.jpg Preping for the Attoneys  Facing North.jpg Started installing the Curtain wall mullions at the South Elevation.jpg UCIA Roof drains-storm piping Facing South.jpg Aligning stone panels at the South Elevation.jpg Burned metal decking at the high roof for the metal stairs Facing North.jpg Electrical rouging at the 2nd floor Facing East.jpg Installed metal furring at Stair -4 shear wall Facing East.jpg Installing duct work at the 4th floor Facing East.jpg
Previous pageNext page Aligning stone panels at the South Elevation
Aligning stone panels at the South Elevation